All responsibilities concerning scheduling were allocated to a single employee. This meant that one man was responsible for keeping production up and running at all times, for ensuring that the required orders were produced and for ensuring that produced goods were delivered on time. This is a heavy burden for any one man to bear. We really needed help, and we chose ROB-EX as our solution to solving the problems.”
Billund Aquaculture: We have reduced the processing time and produce more goods
Digital scheduling has given us the agility and the visuel overview that makes it possible to produce more flexibly. We handle urgent orders in a better way, give our customers immediate responses on their requests, and keep production running smoothly simply because we always have the full overview.
WOCA has increased production by 20% – same manpower
”Without ROB-EX, WOCA Denmark would not have improved efficiency to the extent that we have – and certainly not as rapidly. WOCA has been able to shut down the nightshift, thanks to ROB-EX – and we have increased day-time production by 20% – without additional manpower”
De Danske Gaerfabrikker (”the Danish Yeast Factories”) increased production capacity by 15-20% with ROB-EX
We have increased capacity and improved efficiency significantly by implementing ROB-EX – and we expect to continue to do so. I would like to commend ROB-EX for the way that the system pinpoints the areas in production that have capacity to yield more output.
Bifodan has improved their on-time delivery rate from 82% to 98% and have increased their turnover
ROB-EX provides overview of the production processes of Bifodan, ensuring that production is scheduled so that resources and materials are utilised optimally.
KiiltoClean: ROB-EX for strategic scheduling and allocation of capacity
Palsgaard: Production Scheduling in food manufacturing industries
Fipros get more through their production apparatus because they spend less time on machine setup and changes
As a subcontractor flexibility and reliability of supply is crucial to meet the customers’ needs and wishes. Therefore, Fipros want to be able to deliver every order to the time the customer wants.
Palsgaard have a better visual overview and can plan according to capacity and constraints on equipment
At Palsgaard the implementation of the planning system ROB-EX Scheduler, has influenced the production positively and provided a much better overview of the production processes.
Novozymes has reduced lead times by 30% and achieved a considerable increase in productivity
At Novozymes ROB-EX gather data for detail scheduling from the ERP system SAP. The exchange from SAP to ROB-EX includes order data (batch no., product no.,). This saves double data entries and minimizes errors in data.