This will export the resource workload to an Excel sheet or a CSV text file, per day/week/month in a specified period.

Only the resources (or groups) where a resource type has been specified will be included in the workload calculaton. If a resource type is set on a resource group the workload for all sub resources (and sub groups and their sub resources etc.) within that group will be summed.

Notice that by default the resource type which is set on the resource to include must have it’s “bit flag” no. 15 set (see parameter ‘resourceTypeBitFlagNo’ below).

Example parameter configuration

Example output (Excel)

Month by month in three months.

Resource Resource type Month Avail
Cleaning Type 1 Nov-10 0
Construction group Type 1 Nov-10 0
Construction2 Type 1 Nov-10 0
Cooling Type 1 Nov-10 0
Heating Type 1 Nov-10 800
Laboratory Type 1 Nov-10 0
Painting Type 1 Nov-10 0
Painting2 Type 1 Nov-10 0
Painting3 Type 1 Nov-10 4560,5
Painting4 Type 1 Nov-10 0
Tech-Secr Type 1 Nov-10 133
Welding group1 Type 1 Nov-10 1862
Prod-DK Type 2 Nov-10 10660
Prod-Ext Type 2 Nov-10 6560
Supervisor Type 2 Nov-10 0
Welding group2 Type 2 Nov-10 1640
Welding2 Type 2 Nov-10 0
Cleaning Type 1 Dec-10 0
Construction group Type 1 Dec-10 0
Construction2 Type 1 Dec-10 0
Cooling Type 1 Dec-10 0
Heating Type 1 Dec-10 820
Laboratory Type 1 Dec-10 0
Painting Type 1 Dec-10 0
Painting2 Type 1 Dec-10 0
Painting3 Type 1 Dec-10 4703
Painting4 Type 1 Dec-10 0
Tech-Secr Type 1 Dec-10 137
Welding group1 Type 1 Dec-10 1918
Prod-DK Type 2 Dec-10 10985
Prod-Ext Type 2 Dec-10 6760
Supervisor Type 2 Dec-10 0
Welding group2 Type 2 Dec-10 1690
Welding2 Type 2 Dec-10 0
Cleaning Type 1 Jan-11 0
Construction group Type 1 Jan-11 0
Construction2 Type 1 Jan-11 0
Cooling Type 1 Jan-11 0
Heating Type 1 Jan-11 760
Laboratory Type 1 Jan-11 0
Painting Type 1 Jan-11 0
Painting2 Type 1 Jan-11 0
Painting3 Type 1 Jan-11 4343,5
Painting4 Type 1 Jan-11 0
Tech-Secr Type 1 Jan-11 126,5
Welding group1 Type 1 Jan-11 1741
Prod-DK Type 2 Jan-11 10140
Prod-Ext Type 2 Jan-11 6240
Supervisor Type 2 Jan-11 0
Welding group2 Type 2 Jan-11 1560
Welding2 Type 2 Jan-11 0

Week by week in three weeks.

Resource Resource type Week Avail
Cleaning Type 1 2010-46 0
Construction group Type 1 2010-46 0
Construction2 Type 1 2010-46 0
Cooling Type 1 2010-46 0
Heating Type 1 2010-46 180
Laboratory Type 1 2010-46 0
Painting Type 1 2010-46 0
Painting2 Type 1 2010-46 0
Painting3 Type 1 2010-46 1023,5
Painting4 Type 1 2010-46 0
Tech-Secr Type 1 2010-46 30
Welding group1 Type 1 2010-46 420
Prod-DK Type 2 2010-46 2405
Prod-Ext Type 2 2010-46 1480
Supervisor Type 2 2010-46 0
Welding group2 Type 2 2010-46 370
Welding2 Type 2 2010-46 0
Cleaning Type 1 2010-47 0
Construction group Type 1 2010-47 0
Construction2 Type 1 2010-47 0
Cooling Type 1 2010-47 0
Heating Type 1 2010-47 180
Laboratory Type 1 2010-47 0
Painting Type 1 2010-47 0
Painting2 Type 1 2010-47 0
Painting3 Type 1 2010-47 1030
Painting4 Type 1 2010-47 0
Tech-Secr Type 1 2010-47 30
Welding group1 Type 1 2010-47 420
Prod-DK Type 2 2010-47 2405
Prod-Ext Type 2 2010-47 1480
Supervisor Type 2 2010-47 0
Welding group2 Type 2 2010-47 370
Welding2 Type 2 2010-47 0
Cleaning Type 1 2010-48 0
Construction group Type 1 2010-48 0
Construction2 Type 1 2010-48 0
Cooling Type 1 2010-48 0
Heating Type 1 2010-48 180
Laboratory Type 1 2010-48 0
Painting Type 1 2010-48 0
Painting2 Type 1 2010-48 0
Painting3 Type 1 2010-48 1030
Painting4 Type 1 2010-48 0
Tech-Secr Type 1 2010-48 30
Welding group1 Type 1 2010-48 420
Prod-DK Type 2 2010-48 2405
Prod-Ext Type 2 2010-48 1480
Supervisor Type 2 2010-48 0
Welding group2 Type 2 2010-48 370
Welding2 Type 2 2010-48 0

Day by day in three days.

Resource Resource type Day Avail
Cleaning Type 1 15 Nov 0
Construction group Type 1 15 Nov 0
Construction2 Type 1 15 Nov 0
Cooling Type 1 15 Nov 0
Heating Type 1 15 Nov 40
Laboratory Type 1 15 Nov 0
Painting Type 1 15 Nov 0
Painting2 Type 1 15 Nov 0
Painting3 Type 1 15 Nov 217
Painting4 Type 1 15 Nov 0
Tech-Secr Type 1 15 Nov 6,5
Welding group1 Type 1 15 Nov 91
Prod-DK Type 2 15 Nov 520
Prod-Ext Type 2 15 Nov 320
Supervisor Type 2 15 Nov 0
Welding group2 Type 2 15 Nov 80
Welding2 Type 2 15 Nov 0
Cleaning Type 1 16 Nov 0
Construction group Type 1 16 Nov 0
Construction2 Type 1 16 Nov 0
Cooling Type 1 16 Nov 0
Heating Type 1 16 Nov 40
Laboratory Type 1 16 Nov 0
Painting Type 1 16 Nov 0
Painting2 Type 1 16 Nov 0
Painting3 Type 1 16 Nov 223,5
Painting4 Type 1 16 Nov 0
Tech-Secr Type 1 16 Nov 6,5
Welding group1 Type 1 16 Nov 91
Prod-DK Type 2 16 Nov 520
Prod-Ext Type 2 16 Nov 320
Supervisor Type 2 16 Nov 0
Welding group2 Type 2 16 Nov 80
Welding2 Type 2 16 Nov 0
Cleaning Type 1 17 Nov 0
Construction group Type 1 17 Nov 0
Construction2 Type 1 17 Nov 0
Cooling Type 1 17 Nov 0
Heating Type 1 17 Nov 40
Laboratory Type 1 17 Nov 0
Painting Type 1 17 Nov 0
Painting2 Type 1 17 Nov 0
Painting3 Type 1 17 Nov 223,5
Painting4 Type 1 17 Nov 0
Tech-Secr Type 1 17 Nov 6,5
Welding group1 Type 1 17 Nov 91
Prod-DK Type 2 17 Nov 520
Prod-Ext Type 2 17 Nov 320
Supervisor Type 2 17 Nov 0
Welding group2 Type 2 17 Nov 80
Welding2 Type 2 17 Nov 0

Parameter descriptions

(* = configuration required)

applyFiltering

If true the exported workload will reflect the workload graph settings and the filter settings in the Gantt chart.

Default false

availableHoursText

Specify the text to be printed in the header cell for the available hours column.

The default is ‘(avail)’.

dayDateFormat

Specify the date format to use if ‘D’ is specified in ‘periodType’.

Default is ‘d MMM’, i.e. 3 Aug.

For additional examples se Formatting dates

dayText

Specify the text to be printed in the header cell for the period column, when ‘periodType’ is specified to ‘D’.

The default is ‘Day’.

decimalSeparator

The decimal separator used when exporting numbers, i.e. ‘,’ or ‘.’ (comma or period).

If left blank the default decimal separator corresponding to language preferences are automatically selected.

excludeFinishedWorkload

Specify true to ignore workload already finished on operations in progress.

Default false.

fileNameCSV *

Directory path including filename to the export file can be specified.

This must be specified if “outputAsCSV” is true.

Example: c:\workloadOverview.csv

fileNameExcel *

Directory path including filename to the export file can be specified.

Example: c:\workloadOverview.xls

includeOperationStates

Only relevant if ‘includeOperations’ is enabled.

Define the operation states to include on the report. Default is 20, 30, 40. See also ‘usedHours1StatusList’.

includeOperations

If this is enabled operations are added to the report. One row per operation, after each resource. At least 2 columns are always shown when this is enabled – ‘Operation’ and ‘Operation hours’. More columns can be added, see parameter ‘insertOperationColumns’.
This is only supported if ‘outputAsCSV’ is false.

insertOperationColumns

Here a list of layout items (fields/columns) can be defined. The same fields as in the field chooser in ROB-EX tables can be used.

For a list of the possible fields see the variable list. In the field chooser the id of a field is also shown.

Default is:
order_name, order_customer_name, opr_state, opr_start_time_readable, opr_end_time_readable

monthDateFormat

Specify the date format to use if ‘M’ is specified in ‘periodType’.

Default is ‘MMM-yy’, i.e. Aug-10.

For additional examples se Formatting dates

monthText

Specify the text to be printed in the header cell for the period column, when ‘periodType’ is specified to ‘M’.

The default is ‘Month’

numberFormat

The format of the numbers. #.## means for instance 10,57 (rounded from 10,56739). A hash symbol (#) indicates the max number of decimals, in this case it’s two. The format ‘0.00’ indicates exactly two decimals – i.e. 10,50.

The default is ‘#.##’. This is only relevant if ‘outputAsCSV’ is true.

onlyFinishedHours

If ‘true’ is specified only the finished hours will be reported for operations in progress. In this case parameter “excludeFinishedWorkload” has no effect.

Default is ‘false’.

outputAsCSV

If ‘true’ is specified the output format will be in CSV instead of XLS.

Default is ‘false’.

period

The quantity of days, weeks or months – dependent of what is specified in ‘periodType’.

periodType

‘D’, ‘W’ or ‘M’ can be specified. For instance if ‘W’ is specified and ‘4’ is specified in ‘period’ the workload will be calculated week by week in four weeks.

resourceText

Specify the text to be displayed in the resource header column.

The default is ‘Resource’.

resourceTypeBitFlagNo

If this is specified the resource types which is set on the resources to include must have the specified bit no. set.

This is done in “Edit->Resource” dialog. Select the “Resource types” tab and check the “Optional sub category” shown below.

Possible values are 8, 9, 10, 11, 12, 13, 14, 15. The default is 15.

resourceTypeText

Specify the text to be displayed in the resource type header column.

The default is ‘Resource type’.

separator

Specify the character used to delimit the columns of the generated CSV file.

The default is ‘;’ (semicolon).

sheetName

Specify the name of the Excel sheet to put the data in.

Default is ‘Workload Overview’

start

The start date from where the workload calculation should be performed.

The keyword “this week” corresponds to Monday morning at 00:00 in the current week. It is possible to add and subtract by specifying for instance ‘this w-3w+2d’ (or ‘this week – 3weeks + 2days’) (also see period parameter). Please notice that ‘m’ corresponds to month and NOT minute.

Supported notation: “now” or “this week” (not “this month”), y/year(s), m/mon/month(s), w/week(s), d/day(s), h/hour(s), min/minute(s) and s/sec/second(s).

The default is ‘this week’.

If ‘M’ is specified in ‘periodType’ the calculation will be performed from the first day in the month specified in this field. For instance if ‘this week + 2 days ‘ are specified – resulting in for instance the 18th of Nov, the calculation will be performed from the 1st of Nov at 00:00 in the morning.

If ‘W’ had been specified in ‘periodType’ the calculation would be performed from Monday the 15th of Nov at 00:00 in the morning.

At last if ‘D’ is specified in ‘periodType’ the calculation will be performed from the 18th of Nov from 00:00 in the morning.

Thus specifying hours, minutes or seconds will not give any effect.

usedHours1StatusList

Specify a comma separated operation state list to include in the workload calculation. This is used in the ‘Used1’ column.

Example: If ’20, 40’ is specified only operations with state planned or startet is included in the workload calculation.

Possible states:

15   Reserved/Forecast
20   Planned
30   Start possible
40   Started
50   Paused
60   Cancelled
70   Completed

If nothing is specified all states except ‘70’ are included.

usedHours2StatusList

Specify a comma separated operation state list to include in the workload calculation. This is used in the ‘Used2’ column. If nothing is specified all states except ‘70’ are included.

usedHours3StatusList

Specify a comma separated operation state list to include in the workload calculation. This is used in the ‘Used3’ column. Leave blank if no calculations is whished in this column.

usedHours4StatusList

Specify a comma separated operation state list to include in the workload calculation. This is used in the ‘Used4’ column. Leave blank if no calculations is whished in this column.

usedHoursText1

Specify the text to be printed in the ‘Used 1’ column

The default is ‘(used1)’.

usedHoursText2

Specify the text to be printed in the ‘Used 2’ column

The default is ‘(used2)’.

usedHoursText3

Specify the text to be printed in the ‘Used 3’ column

The default is ‘(used3)’.

usedHoursText4

Specify the text to be printed in the ‘Used 4’ column

The default is ‘(used4)’.

weekDateFormat

Specify the date format to use if ‘W’ is specified in ‘periodType’.

‘yyyy-ww’ will result in ’2010-28’.

The default is ‘yyyy-ww’.

For additional examples se Formatting dates

weekText

Specify the text to be printed in the header cell for the period column, when ‘periodType’ is specified to ‘W’.

The default is ‘Week’.

Feedback

Was this helpful?

Yes No
You indicated this topic was not helpful to you ...
Could you please leave a comment telling us why? Thank you!
Thanks for your feedback.

Post your comment on this topic.

Post Comment