Find
Will close the order list and jump to the Gantt chart and select the operations of the selected productions orders. Use this function to find one or more production orders of interest in the Gantt chart.
Highlight
This is similar to the Find option, with the difference that operations are in addition highlighted in the Gantt chart.
To turn off the highlighting mode, click the filter button in the tool bar.
Project list
Will open the Edit projects window and pre-select the project of currently selected production order row. This button does not do anything if the selected production order is not assigned to a project.
Route
The window Edit route is opened with the production order route pre-selected. From this window you are able to edit additional fields and attributes at route level. The functionality of the production order route editor is described in the section about editing master routes, since the functionality is the same no matter if you edit a master route or a production order route.
KPI
Show KPI statistics about the selected orders. See Key Performance Indicator.
Post your comment on this topic.