A key feature of any serious scheduling system, is being able to schedule based on the actual situation of the shop floor. I.e. taking actual production progress into consideration.
ROB-EX Scheduler has several different ways of obtaining, visualizing and scheduling with progress. Please read more about the possibilities here.
Post your comment on this topic.