Show one or more projects in the project view.
Switch between Project view and Gantt view. | |
The project tree shows the contents of the selected project i.e. project milestones, production orders and subprojects. The nodes in the tree can be expanded or collapsed by pressing the +/- icons or by right clicking on a node to open the short cut menu, showing some common used functions in the tree. The screen shot below illustrates the right click menu for the top node. The columns in the tree can be changed with help from the Field chooser. |
|
The Gantt chart shows the operations for each node in the project tree. | |
The project duration bar shows the total extent of the project, from the first to the last operation. The look of the bar can be changed in the Functions – Settings – General window. | |
Milestones in the project. | |
Production order and operations in the project. |
Subprojects
Projects can be added to other projects as subprojects, in as many levels as desired.
The icons in the tree symbolizes the level for a subproject
Top-level project | |
Project at level 2 | |
Project at level 3 etc. |