Changes the status to the specified value for all operations currently selected in the gantt chart.

Parameter descriptions
(* = configuration required)
force
force a status change even though it may not correspond to the current production order status
true= force
false = do not force
status *
the status to set on the currently selected operations
10 = Incomplete
15 = Reserved
20 = Planned
30 = Start possible
40 = Started
50 = Paused
60 = Cancelled
70 = Completed



Post your comment on this topic.