Changes the status to the specified value for all operations currently selected in the gantt chart.

Example parameter configuration

Parameter descriptions

(* = configuration required)

force
force a status change even though it may not correspond to the current production order status

true= force
false = do not force

status *
the status to set on the currently selected operations

10 = Incomplete
15 = Reserved
20 = Planned
30 = Start possible
40 = Started
50 = Paused
60 = Cancelled
70 = Completed