WOCA has been able to shut down the nightshift, thanks to ROB-EX – and we have increased day-time production by 20% – without additional manpower.
Merry Christmas
Merry Christmas and a Happy New Year from all of us at ROB-EX A/S. Our Support is open during the holidays on December 23rd, 27th, 30th.
ROB-EX celebrates its 20th anniversary
2019 is a special year for ROB-EX – we are celebrating our 20th anniversary.
Visual, dynamic and detailed production scheduling in pharmaceutical industry
Watch this video for a demonstration of how ROB-EX Scheduler solves the scheduling challenges in pharmaceutical formulation.
Improved ”traffic lights” (color coding)
Tips & Tricks: Quick guide to the Gantt chart colour coding for shortage/lacking materials in situations where minimum/maximum storage volumes have been exceeded.
ROB-EX v6.4.1 is ready for download
Read all about the new improvements and download the new version here.
The complex reality of a production planner: 10 major challenges
Production scheduling is the link that ties production to the other departments in the organisation, e.g. sales, purchasing, R&D, customer services and HR.
ROB-EX to be introduced on the world’s largest production fair IMTS
ROB-EX A/S partnered up with Conperio Technology Solutions from St. Louis and on the 9/10-9/15 2018 Conperio attends the IMTS show in Chicago, the world’s largest production fair to introduce ROB-EX Scheduler.
With ROB-EX it is easier to re-plan and refine plans in detail
“It has become more transparent and we now have an overview of production since we got ROB-EX four years ago,” say the two planners from Vikan, Jacob Nørgaard and René Kälberg, “we are much more in control of the plan, and it is easier to refine it down to the smallest detail.”
Our support is open all summer
ROB-EX A/S is closed for the holidays from July the 16th to July the 27th, but you can get in touch with our support all summer. Mail: support@rob-ex.com or phone: 7022 0170 …