As a subcontractor flexibility and reliability of supply is crucial to meet the customers’ needs and wishes. Therefore, Fipros want to be able to deliver every order to the time the customer wants.
Palsgaard have a better visual overview and can plan according to capacity and constraints on equipment
At Palsgaard the implementation of the planning system ROB-EX Scheduler, has influenced the production positively and provided a much better overview of the production processes.
Novozymes has reduced lead times by 30% and achieved a considerable increase in productivity
At Novozymes ROB-EX gather data for detail scheduling from the ERP system SAP. The exchange from SAP to ROB-EX includes order data (batch no., product no.,). This saves double data entries and minimizes errors in data.
OTV Plast handles more orders because of better scheduling
Henrik Jylov, Managing Director at OTV Plast, states: “In the first three years with ROB-EX our orders have tripled without an increase in our number of employees. I give ROB-EX a significant part of the credit for this”.
Delivery on time gives customers a better service at Krogsgaard’s Machine Shop
Krogsgaard’s Machine Shop uses ROB-EX to schedule their entire production, thus ensuring that products reach the customers on time. Compliance with delivery dates are improved significantly and are generally kept for every order.
Polund provides reliable delivery dates and can see the consequences of their priorities
Lars Pors, director of Polund, states: “Scheduling with ROB-EX enables me to provide our customers with reliable assessments of delivery time and allows me to give my customers alternative delivery times and prices.
Årdal Maskinering will not do without ROB-EX for complex production scheduling
ROB-EX has given Årdal Maskinering a significant better overview. They can see the entire sales order in one single picture, and at the same time see all the different production orders that the sales order consists of.
JP Group has an optimal exploitation of resources, better scheduling, and increased turnover
Johs. Pedersen Maskinfabrik and Dansk Autoparts use Concorde XAL as administration and production management system. In both companies Concorde XAL is integrated with ROB-EX which is used to schedule production in both companies.
UG Metal delivers on time and utilize ressources better as well
UG Metal is one of Denmark’s largest and most modern metal foundries, they use MS Dynamics AX integrated with ROB-EX to plan and schedule their production.
Sjølund can give their customers exact delivery times
Sjølund have a large number of rolling mills, and at any given time they have approximately 1300 current order lines.
- Page 2 of 2
- 1
- 2