Search
Related topics are listed below.
Menu
The user interface » Gantt chart » Menu
Menus: File Edit View Functions Shop Floor (Only with ROB-EX Shop Floor) Manpower (Only with ROB-EX Manpower Planner) Multiuser (Only with ROB-EX Multiuser) Help
File menu
The user interface » Gantt chart » Menu » File menu
Click on… if you want to… New The current plan is cleared completely. It is possible to keep master data. Save the former plan with the functions Save or Save as before “New” is selected in order not to lose…
Edit menu
The user interface » Gantt chart » Menu » Edit menu
Click on… if you want to… Undo Undo the latest movements in the Gantt plan. You can undo infinite times, however, only to the last time the order list has been opened or the last time a new file has been imported. The…
View menu
The user interface » Gantt chart » Menu » View menu
Click on… if you want to… Order name View order name together with the orders The order name is viewed above the order in the Gantt window. The order name is shown as a text above each operation in the Gantt plan. The…
Functions menu
The user interface » Gantt chart » Menu » Functions menu
The menu Functions contains the following options: General Settings Scheduling Strategy XML Plugin Database Plugin Textfile Plugin Manpower User management Macro->Edit Script console Settings – Scheduling strategy Select a scheduling…
Manpower menu
The user interface » Gantt chart » Menu » Manpower menu
Click on… if you want to… Show Manpower graph View the manpower graph in the bottom of the window. The manpower graph shows the manpower requirement pr. hour, day or week depending on the selected horizon. Please refer to chapter…
Multiuser menu
The user interface » Gantt chart » Menu » Multiuser menu
Click on… if you want to… Log in Open a connection to the Multiuser server. Note that if you have been working in an off-line plan any changes must be saved to a file first. Before logging in parameters must be configured in the…
Help menu
The user interface » Gantt chart » Menu » Help menu
Click on… if you want to… User’s manual View the ROB-EX online user’s manual To print the entire manual or selected areas, we recommend printing from the pdf version of the manual. You may open the PDF version of the…
Shop Floor menu
The user interface » Gantt chart » Menu » Shop Floor menu
Click on… if you want to… Start server Start the Shop Floor web server The Shop Floor web server must run in order to let the Shop Floor users log on the system. When the Web server runs the text “Shopfloor running” is…
Right click menu
The user interface » Gantt chart » Right click menu
Functions for adjusting operations and orders in the Gantt chart. Use the right mouse button to click on an operation in the plan. Selecting Select order Select all activities in the order. The function is used when all activities in an order is to be moved in…
Show or hide menu items in the right click menu
Product configuration » Enable/Disable GUI elements » Show or hide menu items in the right click menu
When the user right-clicks an operation on the Gantt chart a popup menu appears with various menu items in it. The menu items can be hidden, or the hidden ones can be shown. The “Change resource” menu item is by default visible as shown below. To hide the…
The user interface
The user interface
The main window The following features are part of the main ROB-EX Scheduler window: The Gantt chart. Menu Toolbar Detail panel Short cut menu Edit operation Create express order
Product configuration
Product configuration
Welcome to the documentation for users/consultants performing additional configuration or development on ROB-EX clients. The documentation includes chapters on Installation FAQ (Frequently Asked Questions) Changing global parameters affecting GUI and business logic…
REST Server
Import and export » REST Server
Page Content Introduction Requirements Starting the REST server Test connection FAQ / Troubleshooting Introduction When enabled, the REST Server, provides the user with a REST Based Client API (a set of web-services). This allows for custom integration…
Time Tracker search option
Options » Time Tracker » Time Tracker search option
Introducing a new search field As of version 7.2, we’re now introducing a new search field in the top right corner of the TimeTracker page. This new field can find resources, operations, and production orders, by typing or barcode scan, the entity name or id in the…
Shift calendars
Master data » Shift calendars
For a quick hands-on intro the Create simple shift calendar in the “Getting started” section is recommended reading. This chapter contains the following: Introduction Examples of contributions from sub-calendars Creating a general…
Scheduling
Scheduling
Scheduling orders : How to schedule or reschedule orders in ROB-EX. Scheduling strategy window: Strategies and setting available when planning in ROB-EX. Setting a default scheduling strategy : How to set the default scheduling strategy used for new…
The Attached Documents tab
Master data » Master routes » Operation list » Editing operation details » The Attached Documents tab
External documents, such as Word documents, spreadsheets, drawing, links to homepages etc. can be attached to operations in ROB-EX. Select “External documents” in the shortcut menu (Right click on an operation). A list of documents attached to the operation…
Attached documents
Master data » Resources » Resource tree » Attached documents
External documents, such as Word documents, spreadsheets, drawings, links to homepages etc. can be attached to resources in ROB-EX. Select External documents in the shortcut menu (Right-click on an operation). A list of documents attached to the operation is shown.…
Materials and BOM
Master data » Materials and BOM
Bill of material The ROB-EX Scheduler Bill of Material (BOM) module supports simultaneous scheduling of both capacity and material. This module supports the creation of master materials and the creation of stock transactions like counting’s, purchases and…
Tool bar
The user interface » Gantt chart » Tool bar
Click on… if you want to… New Create a new plan. The present plan is cleared for orders but the selected resources are preserved. It is advisable to save the former plan with the functions Save or Save as…
Track changes by user
Options » Multiuser » Track changes by user
Use this feature to get a list of all changes to a certain ROB-EX Scheduler entity like as an example an operation or a production order. Viewing changes To view changes for a resource, right click the resource in the left side Gantt chart list and select the…
Archiving
Options » Multiuser » Archiving
The archive functions in ROB-EX is used to remove data from ROB-EX Scheduler Client no longer needed for the planning process, but still retain the data in the ROB-EX Scheduler database. This is typically old data which cannot be deleted for different reasons. As an…
Operation split and join
Production orders » Operation split and join
Use the Split operation function to split operations into two or more operations. The function is available by double clicking in the column “Split” in the operations list of the route editor selecting “Split operation” in the shortcut menu,…
Site configuration
Options » Multiuser » Configuration » Site configuration
As a user with administrator privileges, you will have access to the Site configuration menu item. Clicking the Site configuration menu item will display the following window: In the picture above it can be seen, that a second site has been added in addition to…
Running multiple instances
Options » Multiuser » Server installation » Running multiple instances
It is supported to have several ROB-EX server instances running on the same server PC (i.e. each instance is installed to a different directory and started and stopped by each own service). This may be useful to support two isolated setups for respectively test and…
SplitOperationsByStorageSpace
Macro » SplitOperationsByStorageSpace
Split or move producing operations to suitable warehouse resources – where there are enough space. If a warehouse is found with enough space for the entire operation it is moved to the resource assigned to that warehouse. Otherwise the operation is splitted and…
Starting and stopping ROB-EX server
Options » Multiuser » Server installation » Starting and stopping ROB-EX server
The ROB-EX Multiuser Server is automatically started through a dedicated Windows background service. This ensures that the server program is automatically started in the event that the server PC is rebooted. Start from Windows services manager Open the Windows…
XML minimal example
Import and export » XML » XML minimal example
This is the “Hello world” example for ROB-EX XML import, showing the minimum required information that must be supplied in order to import 2 resources and 1 production order with 2 operations into ROB-EX. Essentials of the XML document structure is…
Sub-operations
Master data » Master routes » Operation list » Sub-operations
Table of contents Introduction Using sub-operations Creating sub-operations Editing sub-operations Adding sub-operations to normal operations Scheduling with sub-operations Introduction A sub-operation is a special type of operation that can be…
Attached documents
Master data » Attached documents
External documents, such as Word documents, spreadsheets, drawings, links to homepages etc. can be attached to e.g. operations or orders in ROB-EX. The “Documents” dialog (go to “Edit -> Documents”) shows a list of all the documents which are…
Server installation
Options » Multiuser » Server installation
This chapter explains how to install a test or production instance of ROB-EX Scheduler Multiuser Server 7.0 or later. Prerequisites Make sure the following pre-requisites are OK before proceding to install ROB-EX Scheduler Multiuser Server A Microsoft SQL server…
SortAndSchedule
Macro » SortAndSchedule
This macro command supports easy rescheduling of orders based on one or more configurable sorting fields. Starting from ROB-EX Scheduler 7.2.4, this macro will utilize the Selection context feature. In more detail the SortAndSchedule macro command will carry out the…
Alternate routes
Master data » Master routes » Alternate routes
As an example of how to get started using alternate routes these step-by-step instructions shows how to configure a simple plan to use alternate routes. The example shown below is available in the planning file “\data\alternate route example.xml”…
Enable/Disable GUI elements
Product configuration » Enable/Disable GUI elements
Introduction This section describes how to customize GUI elements like buttons, text fields, and menu items in the right-click menu and the top bar in ROB-EX. You will use this for two main purposes Customize what is visible in the Detail Panel located above the…
Using date and time fields
Web Planner » Field chooser to customize windows and tables » Using date and time fields
The date format of df (date fieldI) renderer types can be changed in the field properties in the “Format” textfield. Here are a few examples of common date formats: 2022-07-18 13:47 yyyy-MM-dd HH:mm 18-07-2022 13:47 dd-MM-yyyy HH:mm 07-18-2022…
Detail panel
The user interface » Gantt chart » Detail panel
Mark an operation in the Gantt chart and see detailed information about the selected operation, order, and project The panel is activated/deactivated in the menu View. Operation Production order Project (Only with ROB-EX Project) Manpower (Only with ROB-EX…
.NET Client
Import and export » REST Server » .NET Client
Page Content Introduction Requirements .NET API documentation Simple use cases Advanced use cases Introduction To give the users the ability to easily create a .NET Client that integrates with ROB-EX, we have implemented the .NET Assembly deployed in…
Order list window
Production orders » Order list window
The Order List window provides an overview of all production orders contained in the ROB-EX client. You get to this window by either selecting menu Edit->Order list or by clicking the order list icon in the tool bar. You may also jump to this window from other…
SetOprCalendar
Macro » SetOprCalendar
Will set the start or end calendar on one or more currently selected operations. A calendar chooser is shown to the user allowing him to enter/select the new date and time (only shown if no “autoSetCalendarRule” has been specified) Example parameter…
Gantt chart
The user interface » Gantt chart
The Gantt chart in ROB-EX Scheduler combines the graphical Gantt chart overview with tools making it easy to change and simulate operations and production orders. This is an overview of topics covered in this first section: The Gantt chart Frequently used…
Shop Floor configuration
Options » Shop Floor » Shop Floor configuration
Introduction This document describes how to configure the appearance and behavior of the Shop Floor interface. Examples of how to add/remove columns, change the names and widths of the columns are illustrated. Then some more specific features are described i.e.…
Manpower graphs
Production orders » Manpower graphs
Manpower graphs shows the actual requirement for manpower pr. hour, day or week. For each operation the manpower requirement is entered. The total manpower requirement is shown in the graph in the button of the window. Use the resource button to the left in the…
Web-planner overview
Web Planner » Web-planner overview
This section provides an overview of ROB-EX Web Planner. The main view of the Gantt chart is shown below. Home menu The home menu contains two buttons. The first button for Portal will lead you to the portal site with an overview of all the sites that you have…
Document ROB-EX on-prem deployment
Getting Started » Installing the client » Using the ROB-EX installer » Document ROB-EX on-prem deployment
A PowerShell script that will list all ROB-EX services and applications installed on the current PC. Purpose List and document installed ROB-EX Services and Applications for an on-prem ROB-EX deployment. Typically used in order to document what ROB-EX modules a…
Series and groups
Production orders » Series and groups
The Series function supports the grouping of operations from different orders, having the same properties, for execution in continuation of each other. A series is composed of one or more operation groups, typically one for each resource entered into the series. An…
Guide to scripting
Product configuration » Developing using the API » Guide to scripting
The following will explain the power of ROB-EX Scripting by showing how a simple script is created and executed. Overview The Scripting option allows the full ROB-EX API to be called and manipulated through the Groovy Scripting language. The Groovy language is a…
ResetSplit
Macro » ResetSplit
This macro command can join operations which are split. Furthermore it can delete suborder links, delete linked CIP orders and move original operations back to their resource groups. Select one of the split operations and it will find all the other split members in…
Using the ROB-EX Multiuser
Options » Multiuser » Using the ROB-EX Multiuser
This chapter describes the daily use of ROB-EX Multiuser. When the ROB-EX client is logged into the Multiuser server, the user will be connected to a specific site and will only be working on the plan of that site. It is not possible to change between different plans…
Material graphs
Master data » Materials and BOM » Material graphs
The material graphs visualize the projected stock levels, i.e. the result of all the different stock transactions: Counting Purchase Shipment BOM-line One or more material graphs can be added and each graph can be configured individually. You may choose to…
Search panel
The user interface » Search panel
The search panel offers advanced search functionality where multiple fields can be combined and various search criteria can be set up. The search panel is by default shown in simple mode – thus only one search field is visible. It’s possible to unfold it by…
Project View
Projects » Project View
Project view Show one or more projects in the project view. Switch between Project view and Gantt view. The project tree shows the contents of the selected project i.e. project milestones, production orders and subprojects. The nodes…
Integration client
Advanced functions » Integration client
The ROB-EX Desktop Planner can as needed be installed to run as a Windows service. This is typically useful when a ROB-EX Desktop Planner needs to run unattended batch jobs like interfacing to external ERP systems, running the Shop Floor server, automatic generation…
Scripted updates and installs
Getting Started » Installing the client » Using the ROB-EX installer » Scripted updates and installs
The script is a .BAT script which will execute the standard ROB-EX Setup Installer multiple times without showing the installation wizard. I.e. the .BAT script will automatically update or install multiple ROB-EX components. The script: Will stop services like…
Tab: File
Advanced functions » General settings » Tab: File
The size of the recent file history shown at the bottom of the “File” menu. If selected the current plan is automatically saved with specified interval in minutes If ROB-EX at startup should load the same file that…
Tab: Shop Floor
Advanced functions » General settings » Tab: Shop Floor
Also visit the general introduction to ROB-EX Shopfloor. If the Shopfloor web-server should be automatically started when the ROB-EX client is started. The web-server must be running before any user can log into the Shopfloor pages. However setting up…
Commonly used Feature Containers
Product configuration » Enable/Disable GUI elements » Commonly used Feature Containers
The most common feature containers and the related dialogs where they are used which will help you to enable/disable and show/hide commonly used textfields, labels and buttons form the user interface of ROB-EX Desktop Client Feature…
Transition rules
Scheduling » Scheduling Settings on Resources » Transition rules
Resource Transition Rules will add more detailed constraint modeling, down to single-resource and single-product. The transition rules enable the possibility to block resource changes depending on the previous or next operations (i.e. not only based on the current…
Batch
Options » Batch
The ROB-EX Batch module contains powerful features with high relevance for, as an example, the Food and Beverage industry, Chemical processing and Health and Pharmaceutical. In a few words this module contains features that can: create multilevel batch orders based…
Creating resources
Getting Started » Solving my first scheduling problem » Creating resources
Start out creating all the resources you are going to plan for. In the menu select “Edit/Resource”. The following dialog Edit resource will be shown. Right click on the headline Resources in the top right corner of the resource list and select…
Creating a general calendar
Master data » Shift calendars » Creating a general calendar
A general calendar is created in the following way: Select menu Edit->Calendar to open the window “Edit resource calendar”. Select the tab “General calendar” Click the New button to the right of the list “General calendar”.…
Developing using the API
Product configuration » Developing using the API
API Developers Kit The API Developers Kit will enable custom programs to be written and executed embedded into the ROB-EX client. The program or script written interacts with the ROB-EX client through a Java based API (Application Programming Interface). The API will…
The graph area
The user interface » Gantt chart » The graph area
The graph area shows different kinds of graphs, such as Workload graph Manpower graph (refer to chapter Optional modules->Manpower) Material graph (refer to chapter Optional modules->BOM) If more graphs are selected to be shown at the same time, a scroll bar is…
Warehouses
Master data » Materials and BOM » Warehouses
Warehouse locations can be used if the warehouse is spread out over multiple locations. Thus it’s possible to view the total stock level for a given material or view the level in a certain warehouse. The window to create a new warehouse is opened by the menu…
Schedule new orders
Getting Started » Solving my first scheduling problem » Schedule new orders
Production orders with status New are only visible in the Order list, not in the Gantt chart. I.e. none of the orders occupy capacity on resources as of yet. *A new production order can automatically be created as planned and thus immediately be added to the Gantt…
Interfacing using Talend Open Studio for Data Integration
Import and export » Interfacing using Talend Open Studio for Data Integration
An easy and recommended approach, when building interfaces between ROB-EX and external systems like ERP, is to use an ETL tool (Exctract, Transform, Load). Using a tool reduces the learning curve required, enabling non-developers to create even complex…
Create simple shift calendar
Getting Started » Solving my first scheduling problem » Create simple shift calendar
Before you are able to schedule any production orders in ROB-EX Scheduler, you will need at least a single shift calendar. For a more elaborate introduction of modeling shift calendars, refer to the chapter Editing resource calendar. For the sake of this…
General settings
Advanced functions » General settings
This document explains the different settings available in the ROB-EX planner client menu: Functions->Settings->General. Help is available on the following topics Standard File Gantt chart Graphs & windows Shopfloor Multiuser Express order Resource…
Create a resource specific calendar
Master data » Shift calendars » Create a resource specific calendar
The resource specific calendar is used to specify periods of time that deviate from the ordinary holiday, weeks and calendar specific calendars. As an example it could be planned down time like a preventive maintenance job. Changes to the resource specific calendar…
Route networks
Master data » Master routes » Route networks
The route network features allow a product to be modeled as a multi level part list. It can be thought of as a bill of material (BOM), but instead of materials it is the route that is the building block. A route network is used as template for a project, i.e. the…
Left side resource list
Web Planner » Web-planner overview » Left side resource list
In the ROB-EX Web Planner, you can find the resources to the left. Hover over one of the resources and the menu bar will show up. In this section, we will explain the menu bar for the resource, views, and field chooser for the resource. Single resource view…
CSV 2+3
Import and export » CSV integration » CSV 2+3
This chapter will explain how to interface between an external system (e.g. ERP) and ROB-EX using the CSV 2+3 integration module. It is possible to transfer data both ways. Data possible to transfer with CSV 2+3 interface Resources Resource…
Interface History Manager
Import and export » Interface History Manager
The interface history manager is used on integration clients to inform other ROB-EX Scheduler clients about the current status of the interface between ROB-EX and an external ERP system. In combination with the integration status bar, other clients will be able to…
Resource Monitor System configuration
Reporting and KPI » Resource monitor » Resource Monitor System configuration
This is a quick guide for the ROB-EX system administrator, explaining how to configure the web-server side of the ROB-EX Resource Monitor App. If not already running, configure ROB-EX Integration client to run as a service. Make sure the integration client starts…
GenerateReport
Macro » GenerateReport
This macro can silently (option) generate both HTML reports (i.e. menu File->Print HTML) as well as prints of the current resource or project gantt view (i.e. menu File->Print). Example parameters for printing HTML report Example parameters for printing…
Proficy Workflow Client
Import and export » REST Server » Proficy Workflow Client
Page Content Introduction Requirements Installation Usage Example FAQ / Troubleshooting Introduction ROB-EX and Proficy Workflow can be easily integrated by using the Service Provider implementation implemented in the Robex.Workflow.dll. For documentation on…
AdjustResource
Macro » AdjustResource
The selected operation will be moved to the specified date and the rest of the operations within the specified period will be replanned. Specify the date by using the dialog shown below. Example parameter configuration The three horizons can be specified in…
Tab: Project and Economy
Advanced functions » General settings » Tab: Project and Economy
This module is only available with license to Project and Economy. Setting Description Distribute economy evenly across operation duration If resource calendar is used, the turnover is distributed across the hours available. The turnover…
Standard Excel Import
Import and export » CSV integration » Standard Excel Import
This package comes with a ready-to-use Excel file for easy import of order data into ROB-EX. The package has the following features: A ready to use Excel sheet with build in flexibility regarding columns, naming and formatting. Copy and paste of orders directly…
Tab: Standard
Advanced functions » General settings » Tab: Standard
Standard settings for Orders Default values and settings for orders If checked, this will set the precondition flag when creating new orders. The default priority or new orders. The default customer for new…
Project list
Web Planner » Project list
In the menu line, you find the button to open the project list Click on the button and the project list will slide in on the right-hand side of the screen. The picture below shows the project list with all the projects for the plan. The below picture shows and…
Resources
Master data » Resources
Resources and resource groups may be edited by selecting menu Edit->Resources. Resources can be shown as: Normal resources (machines, employees, tools, etc.) Resource groups Resource categories (used when organizing resources and resource groups into logical…
Creating production orders
Getting Started » Solving my first scheduling problem » Creating production orders
Once master data has been created as described in the previous sections, production orders can be created and scheduled. In order to create a production order follow the steps below. Open the window “Order list” by selecting the item “Edit->Order…
Categories
Master data » Materials and BOM » Categories
Categories can be used for subdividing or grouping materials. I.e. if you have materials of different variants or materials that can be in different states. As an example a material named “Screws” has a category named “Type”, in order to be…
XML
Import and export » XML
This chapter will explain how to interface between an external system (e.g. ERP) and ROB-EX using the XML integration module. It is possible to transfer data both ways. Data possible to transfer with XML interface Resources Resource calendar Products and raw…
Update existing ROB-EX system
Getting Started » Installing the client » Using the ROB-EX installer » Update existing ROB-EX system
Updating the client Download the Full Setup program to a directory on your local hard disk or file server. Next ensure that all ROB-EX Planner or ROB-EX Viewer users do not use the program, updating can only take place if all users have shut down their ROB-EX Client…
Tab: Materials
Advanced functions » General settings » Tab: Materials
Note that this tab is only available with license to the BOM module. If “No graphics” is selected then material graphs will show values but without bar graphics. If enabling graphics specify the height in pixels for each material graph…
Dashboard Quick Guide
Reporting and KPI » Dashboard App » Dashboard Quick Guide
This is a quick guide to the user interface of the App. The home screen From this screen, you can jump to different KPI areas. Orders – e.g. Scheduled Order delivery performance Projects – e.g. Scheduled Project delivery performance. Operations…
Constraint editor
Master data » Master routes » Operation list » Constraint editor
Constraint editor When adding or removing operations to a route the operations will be added with a default constraint from the previous operation end to the new operation start. The constraint editor allows further editing of the network: remove existing…
SQL integration
Import and export » SQL integration
This chapter describes the integration between an ERP system and ROB-EX using an integration database. Data are exchanged between ROB-EX and the ERP system through a neutral integration database named ‘GanttERP2’. Data possible to transfer with the…
Licensing of versions prior to 6.4
Getting Started » Starting up the client » Licensing of versions prior to 6.4
The following applies to ROB-EX version 6.2 and older versions. For version 6.4 and newer read instead Licensing version 6.4 and newer. The first time you start ROB-EX Scheduler you will be asked to register. Press the register button. You are presented with a unique…
Creating master operations
Getting Started » Solving my first scheduling problem » Creating master operations
Once shift calendars and resources has been defined, it is time to create the master operations which are needed in order to create routes. An operation in the ROB-EX Scheduler term, describes a process to perform (i.e. cut, grind, etc.) and the list of resources…
Controlled overlap
Master data » Master routes » Operation list » Editing operation details » The Times tab » Controlled overlap
The function controlled overlap supports different kinds of overlap (send-ahead) between two operations. The function is available when double-clicking on an operation in the Gantt chart and the window Edit operation will show up, on the Times tab the settings for…
Security rule management
Options » Multiuser » Configuration » Security rule management
As a user with administrator privileges, you will have access to the Security rule management menu item. Through the security rule management display the following workflows can be executed add/edit role for a local user for a specific site add/edit role for a…
The Times tab
Master data » Master routes » Operation list » Editing operation details » The Times tab
Field Explanation Quantity factor Adjust the number of pieces on the specific operation. Example: An order produces 100 tables. The current operation produces table legs. For every table on the production order, this operation produces 4…
CSV 1 integration
Import and export » CSV integration » CSV 1 integration
This chapter describes the setup and use of the module CSV 1 integration for ROB-EX Scheduler. Using this module text files with data delimited by comma, semi colon etc. containing order and routing information can be imported into ROB-EX. The following are examples…
PalletSystemScheduling
Macro » PalletSystemScheduling
Modern FMS systems/CNC centers typically operate with pallets and fixtures in order to optimize the utilization of the machine centers. I.e. the machine processes one pallet while operators are preparing the next pallet. The scheduling of pallet systems can be…
Order list
Web Planner » Order list
Find the button to open the order list in the top menu. Click on the button and the order list will slide in on the right-hand side of the screen, to slide the order list out again use the arrow to the left of the header orders. The picture below shows the order list…
Pegging
Macro » Pegging
This macro will create pegging links (material dependencies) between operations which respectively consume and produce a semi finished product. A good understanding of the ROB-EX BOM module is vital to understand the concepts of the pegging macro. Background A…
Shop Floor
Options » Shop Floor
ROB-EX Scheduler Shop Floor allows the user to view the current production schedule on a per equipment basis. A Shop Floor user can report partial and final completions for any operation. The only requirement is a standard internet browser with a network connection to…