This macro command can join operations which are split. Furthermore it can delete suborder links, delete linked CIP orders and move original operations back to their resource groups. Select one of the split operations and it will find all the other split members in the same production order and join them. If the operations are split in multiple levels (an already split operation which is split again etc…) this is handled so all will be joined (by bottom-up).

Example parameter configuration

Preconditions

  1. A license to the Batch module is needed.

Hints

  1. Split operations from multiple orders can be selected and reset in one go.

Parameter descriptions

(* = configuration required)

deleteCIPOrders
Delete CIP orders which are linked (by a suborder link) to the operations to join.

Default is false

deleteSubOrderLinks
Delete suborder links going in or out to/from the operations to join.

Default is false

moveToResourceGroup
It can move the original operation (after reset split) up to the resource group specified in the possible resource list on the template operation.

Default false

Feedback

Was this helpful?

Yes No
You indicated this topic was not helpful to you ...
Could you please leave a comment telling us why? Thank you!
Thanks for your feedback.

Post your comment on this topic.

Post Comment