Click on… | if you want to… |
---|---|
Show Manpower graph | View the manpower graph in the bottom of the window. The manpower graph shows the manpower requirement pr. hour, day or week depending on the selected horizon. Please refer to chapter Manpower planner for further details. |
Show detail panel | Show the manpower requirement for the selected operation, in the detail panel. If this function is active, the Manpower line is shown in the detail panel. In the Manpower line it is possible to enter manpower requirement for the selected operation and to see if accumulated overlap is active. |
Post your comment on this topic.